Application Process

A site survey to determine suitability of surface to lay on is required.

If tarmac is raveling or is in very poor condition then repairs may need to be undertaken or a tarmac overlay in some cases.

If concrete is cracked etc. then repairs may need to be carried out also.

 If you have a new project and have no tarmac down at this stage then we can arrange  every thing from start to finish.

  • Suitably prepare surface by removing all loose material.
  • Surface must be clean and dry.Mask off all kerbs gullies etc.
  • Sealer coat may be required  at this stage in some cases depending on surface texture
  • Mix two pack epoxy resin with mechanical drill
  • Pour mixed resin onto prepared surface and spread with  squeegee
  • Scatter loose aggregate onto resin covering the complete area
  • After curing is complete (usually 2 hours @ 15-20 degrees celcius) sweep up all excess stone
  • Vechicles  can drive over the surface within 12 hours
  • Typical application (100m2) takes just 1 dry day!

Our Resin Bonded Aggregate system is designed to have the appearance of natural loose stone but its not loose - its bonded.

Please click on this link to view the complete application process on a recently completed driveway in Dublin 18